SERVICIOS |
MR 38 RAPIDO A TRES DIAS CON GRAVA DE 40 (MM) |
CONCRETO RAPIDO DE 7 DIAS |
CONCRETO 300KG/CM2 RAPIDO A 7 DIAS REVENIMINIMIENTO 10CM |
CONCRETO A LA FLEXION MR 36 RAPIDO A TRES DIAS |
CONCRETO A LA FLEXION MR 45 NORMAL A 28 DIAS |
CONCRETO ANTIDESLAVABLE BAJO EL 250KG/CM2 REV 14CM, BAJO EL AGUA |
CONCRETO BOMBEABLE RAPIDO A 14 DIAS RESISTENCIA 250KG/CM2,REVENIMINIMIENTO 14CM |
CONCRETO BOMBEABLE RAPIDO A 3 DIAS RESISTENCIA 250KG/CM2,REVENIMINIMIENTO 14CM |
CONCRETO BOMBEABLE RAPIDO A 7 DIAS RESISTENCIA 200KG/CM2,REVENIMINIMIENTO 14CM
|
CONCRETO BOMBEABLE RAPIDO A 7 DIAS RESISTENCIA 250KG/CM2,REVENIMINIMIENTO 14CM
|
CONCRETO BOMBEABLE RESISTENCIA 250KG/CM2
|
CONCRETO ESPECILA ANTIDESLAVE.
|
CONCRETO NORMAL 150KG/CM2 REVENIMIENTO 18CM |
CONCRETO NORMAL A 28 DIAS
| CONCRETO NORMAL A 28 DIAS 100KG/CPC40 RS REV-10CM |
CONCRETO NORMAL A 28 DIAS REV. 14CM |
CONCRETO NORMAL A 28 DIAS REV. 18CM 200KG/CM2 |
CONCRETO NORMAL A 28 DIAS REV. 18CM |
CONCRETO NORMAL A 28 DIAS REVENIMIENTO 12CM |
CONCRETO NORMAL A 28 DIAS REVENIMIENTO 18CM |
CONCRETO NORMAL BOMBEABLE RESISTENCIA 200KG/CM2, REVENIMIENTO 14CM |
CONCRETO NORMAL MODULO DE RUPTURA A FLEXION 42KG/CM2 REVENIMIENTO 10CM |
CONCRETO NORMAL MODULO DE RUPTURA A FLEXION 45KG/CM2 REVENIMIENTO |
CONCRETO NORMAL RESISTENCIA 100KG/CM2, REVENIMIENTO 10 CM |
CONCRETO NORMAL RESISTENCIA 150KG/CM2, REVENIMIENTO 10 CM |
CONCRETO NORMAL RESISTENCIA 150KG/CM2, REVENIMIENTO 14 CM |
CONCRETO NORMAL RESISTENCIA 100KG/CM2, REVENIMIENTO 14 CM BOMBA PLUMA |
CONCRETO NORMAL RESISTENCIA 200KG/CM2, REVENIMIENTO 10 CM |
CONCRETO NORMAL RESISTENCIA 200KG/CM2, REVENIMIENTO 14 CM |
CONCRETO NORMAL RESISTENCIA 250KG/CM2, REVENIMIENTO 10 CM |
CONCRETO NORMAL RESISTENCIA 250KG/CM2, REVENIMIENTO 14 CM |
CONCRETO NORMAL RESISTENCIA 250KG/CM2, REVENIMIENTO 10 CM |
CONCRETO NORMAL RESISTENCIA 300KG/CM2, REVENIMIENTO 10 CM |
CONCRETO NORMAL RESISTENCIA 350KG/CM2, REVENIMIENTO 10 CM |
CONCRETO PROFESIONAL 250KG/CM2 BOMBEADO |
CONCRETO PROFESIONAL A LA FLEXIÓN MR 38 RAPIDO A 7 DIAS |
CONCRETO PROFESIONAL RAPIDO A 7 DIAS |
CONCRETO RAPIDO A 14 DIAS BOMBEABLE REV. 14 CM2 |
CONCRETO RAPIDO A 14 DIAS RESISTENCIA 200KG/CM2, REVENIMIENTO 10 CM |
CONCRETO RAPIDO A 14 DIAS RESISTENCIA 250KG/CM2, REVENIMIENTO 10 CM |
CONCRETO RAPIDO A 3 DIAS |
CONCRETO RAPIDO A 3 DIAS MODULO DE RUPTURA A FLEXION 38 KG/CM2 REVENIMIENTO 1O CM |
CONCRETO RAPIDO A 3 DIAS MODULO DE RUPTURA A FLEXION 42 KG/CM2 REVENIMIENTO 1O CM |
CONCRETO RAPIDO A 3 DIAS MODULO DE RUPTURA A FLEXION 45 KG/CM2 REVENIMIENTO 1O CM |
CONCRETO RAPIDO A 3 DIAS MODULO DE RUPTURA A FLEXION 46 KG/CM2 REVENIMIENTO 1O CM |
CONCRETO RAPIDO A 3 DIAS RESISTENCIA 200KG/CM2, REVENIMIENTO 10 CM |
CONCRETO RAPIDO A 7 DIAS, SERVICIO CON BOMBA |
CONCRETO RAPIDO A 7 DIAS, TIRO DIRECTO REVENIMIENTO 10 CM |
CONCRETO RAPIDO A 3 DIAS REV, 14 TIRO DIRECTO |
CONCRETO RAPIDO A 1 DIA, TIRO DIRECTO 200KG/CM2 |
FIBRA DE PROLOPROPILENO |
IMPER INTEGRAL |
MORTERO NORMAL RESISTENCIA 100KG/CM2 |
MR NORMAL A 28 DIAS CONCRETO A LA FLEXIÓN |
RELLENO FLUIDO NORMAL RESISTENCIA 100KG/CM2 |
RELLENO FLUIDO NORMAL RESISTENCIA 75KG/CM2 |
SERVICIO DE BOMBA POR METRO CUBICO |
SERVICIO DE TUBERIA RIGIDA DE 4" Y DE 3 METROS DE LARGO |
SERVICIO NOCTURNO |